Product Name: | Electrofusion HDPE Fittings End Cap For Water And Gas Supply PN16 SDR11 PE100 | Specification: | 32mm~110*mm PE100 PN16 SDR11 |
---|---|---|---|
Standard: | EN 12201-3:2011,EN 1555-3:2010 | Application: | Gas,Water,Oil Etc |
Material: | PE100 Virgin Raw Material | Port: | China Main Port |
Electrofusion HDPE Fittings End Cap for Water and Gas supply PN16 SDR11 PE100
Production Description of Electrofusion HDPE End Cap
Electrofusion HDPE fittings are welded by electrofusion machine to connect HDPE pipes together:
After electrofusion welding machine plug in electricity and turn on, The copper wire buried inserted in electric fuse HDPE fittings are heated and make HDPE melt, Which joint HDPE pipe and fittings well.
Specification φD | L | A | φd |
32 | 60 | 45 | 4.7 |
40 | 70 | 55 | 4.7 |
50 | 70 | 55 | 4.7 |
63 | 80 | 55 | 4.7 |
90 | 95 | 55 | 4.7 |
110 | 105 | 70 | 4.7 |
Products name | Electrofusion HDPE End Cap |
Sizes Available | As below specification sheet in detail |
SDR | SDR11,SDR17 |
PN | PN16,PN10 |
Material Brand | SINOPEC, BASELL, SABIC, BOROUGE etc |
Executive Standard | EN 12201-3:2011,EN 1555-3:2010 |
Colors Available | Black color , blue color, Orange or as request. |
Packing Method | Normal export packing. by carton |
Production Lead Time | Depending on the order quantity.Normally about 2~3 weeks for 20′ GP, 3~4 Weeks for a 40′GP. |
Certificate | ISO, CE,BV,Factory Test Report |
Supply Ability | 100000 Ton/Year |
Payment Method | T/T, L/C at sight |
Trading Method | EXW, FOB, CFR, CIF,DDU |
Test item | Standard | Conditions | Results | Unit |
1.Melt Flow Index | ISO1133 | 190°C & 5.0Kg 0.2-0.7 | 0.49 | g/10min |
2.Density | ISO1183 | @23°C ≥0.95 | 0.960 | g/cm3 |
3.Oxidation Induction Time | ISO11357 | 210°C >20 | 39 | Min |
4. Hydrostatic Pressure Test | ISO1167 | 80°C 165h, 5.4Mpa | Passed | |
5 Size Check | ISO3126 | 23°C | Passed | |
6 Appearance | Clean& Smooth | 23°C | Passed |
- The results according to test 1-3 are taken form the PE raw material supplier’s report.
- The results according to test 4-6 are taken from the internal test results of fittings sampled from the
- same batch as delivered fittings.
- Marking according EN 12201 – 3 and EN 1555 – 3.
- The pass/fail criteria are based on the requirements of the UNI EN 12201 and UNI EN 1555 standards.